Sales

How to Respond to an RFQ: A Manufacturer's Process From Triage to Win Rate

How manufacturers and industrial suppliers should respond to an RFQ: a bid/no-bid scorecard, the clarifying questions to send, what the quote must contain, a turnaround plan, follow-up after sending, and how to track win rate.

Alexander ChuaCo-Founder, Growigami November 16, 2026 11 min read

To respond to an RFQ well, decide first whether it is worth quoting, ask the questions you need answered before you price, send a complete quote in the buyer’s format before the deadline, follow up until you have a decision, and record the result so you learn which RFQs you win. Most of the gain comes from the steps around the price, not the price itself.

We read the top Google results for “how to respond to an rfq” in November 2026. Most were help pages for procurement software (Felix, Procore, Unimarket, SourceDay) that explain which buttons to click in their portals. One was a construction marketplace writing about requests for qualifications, a different document. One industrial software vendor, Procition, covered the full process well. None gave an owner or sales lead a way to score RFQs, a follow-up schedule, or the numbers to track. This guide adds those.

What buyers want before they call you

Technical buyers do most of their homework alone. In the 2026 State of Marketing to Engineers research by TREW Marketing and GlobalSpec, technical buyers completed 62% of the buying process online before contacting a vendor, and pricing and inventory questions were the top reason they reached out to sales. The same study found that 59% prefer email for the first vendor contact and 22% prefer a phone call.

So by the time an RFQ lands in your inbox, the buyer has usually done the research and shortlisted you. The RFQ is where you can lose a deal you were already close to winning, through a slow reply, a missing line or an unclear condition.

Step 1: Log it and acknowledge it the same day

Before anyone prices anything:

  • Log the RFQ in your CRM or quote log: customer, contact, RFQ number, date received, due date and time zone, number of line items, estimated value, and who owns it.
  • Reply to confirm receipt and give a date for the quote. Buyers like knowing it is in hand.
  • Name one owner. One person is responsible for the deadline, even if estimating, engineering and purchasing all contribute.

A same-day acknowledgment email:

Subject: RE: RFQ 2231, received

Hi Dana, thanks for RFQ 2231 for the bracket assemblies. We’re reviewing the drawings now and plan to send pricing by Thursday, Nov 19. If we have questions about the spec, I’ll send them in one list by tomorrow noon. Ravi

Step 2: Triage with a bid/no-bid scorecard

Not every RFQ deserves a quote. The UK Government Commercial Agency’s supplier guidance says to check whether you can realistically win and deliver the contract, whether you have the resources, and whether you meet the minimum requirements before you start. For a manufacturer, score each RFQ from 0 to 2 on six questions:

Question012
Fit: is this work we are good at?Outside our processesPossible with a partner or new toolingCore work
Capacity: can we make it on their dates?NoWith overtime or reschedulingYes
Margin: can we price it at our target?Below cost or near itThinAt or above target
Relationship: do we know the buyer?Cold, never spokenSome contactCurrent customer or a real conversation already
Chance: are we likely to win?They need three quotes and we are the thirdUnknownWe were invited for a reason
Value: is the customer worth having?One-off, slow payerAverageRepeat volume, good terms

Quote at 8 or more. Between 5 and 7, the owner decides and writes down why. Below 5, decline politely and say why (“our minimum run is 500 pieces”). A polite no keeps the door open for the next RFQ.

Step 3: Send clarifying questions before you price

An incomplete RFQ should not go straight to pricing. Procition’s RFQ guide lists what is often missing: quantities, dimensions, material or grade, scope boundaries, delivery location, certificates, drawings and whether substitutes are allowed.

Send one grouped list, early, and refer to line numbers:

Subject: RFQ 2231, four questions before pricing

Hi Dana, to quote accurately we need:

  1. Line 4: drawing shows 6061-T6, spec sheet says 6063. Which grade?
  2. Annual volume: is 2,000 pieces a single release or a blanket order?
  3. Finish: is clear anodize acceptable, or is Type III required?
  4. Certs: do you need material certs and a first article inspection report with the first shipment?

If we don’t hear back by Wednesday, we’ll quote 6061-T6, a single release and clear anodize, and state those assumptions in the quote. Ravi

Two rules. Use the buyer’s clarification process if the RFQ names one. And never quietly price around an uncertainty: if you must assume, say so in the quote.

Step 4: Build the quote the buyer can say yes to

Mirror the RFQ. If line 12 asks for a part, answer line 12. Do not make the buyer match your format to theirs.

The Australian government’s business guidance lists what a written quote should include at minimum: business and customer details, a clear description of the work, itemised and total costs, any variations discussed, payment terms, start and finish dates, the quote expiry date, and space for the customer’s acceptance. It also notes that an accepted quote can become a binding contract, so check terms with whoever approves your contracts. For a manufacturer, the checklist becomes:

  • RFQ number, revision and date on every page
  • Each line: part number and revision, description, quantity, unit, unit price, extended price
  • Price breaks if you offer them (500 / 1,000 / 2,500)
  • Tooling, setup or NRE charges, shown separately
  • Lead time from PO, and for first article if different
  • Shipping terms and who pays freight
  • Payment terms
  • Quote valid until (a date, not “30 days”)
  • Assumptions and exclusions, in plain words
  • Deviations from spec: what you offer instead, and whether price or lead time changes
  • Certificates and documents the RFQ asked for
  • Name of the person who approved the price, and who to call with questions

If you are pricing near your floor, do not explain the price in the quote. Explain the value in the cover note: lead time, quality record, inventory you hold for them.

Step 5: Check it and submit early

Have someone who did not build the quote check it against the original RFQ. The GCA guidance recommends giving the reviewer the original specification so they can test alignment and accuracy. The check catches the costly mistakes: a missed line, wrong units, a total that does not add up, a lead time the floor cannot hit.

Submit through the channel the buyer asked for, in their template if they sent one, and not in the last hour. Portals have logins, upload limits and outages.

Turnaround: set your own target and measure it

There is no universal right speed, and claims that a faster quote lifts win rate by a set percentage are rarely backed by published data. What you can do is set an internal target by RFQ type and measure against it:

RFQ typeExample internal target
Repeat part, current customer1 business day
New part, standard process3 business days
New part needing engineering review or outside processing5 to 10 business days, with a date given on day 1

These are examples to adapt, not benchmarks. Track your actual hours from receipt to send for each RFQ. After a quarter you will see which types slip and why: waiting on outside quotes, engineering backlog, or one estimator out.

Step 6: Follow up after you send

Sending the quote is the middle of the process. A simple schedule:

WhenWhatWhy
Day 0Send the quote with a two-line summary in the email body: total, lead time, valid untilThe buyer can forward it without opening the file
Day 1 to 2Confirm receipt; offer a 15-minute call to walk through itCatches problems before they compare quotes
Day 5 to 7Ask for the decision date and whether anything needs revisingSurfaces price or spec issues while you can still act
Decision dateCheck inShows you are paying attention
After the decisionAsk why you won or lostThe input to your next quote

Keep every revision tied to the original RFQ in your system: what changed, who asked, which price is current. For follow-up email examples you can adapt, see our sales follow-up email guide. If the RFQ is a formal public procurement, follow its contact rules, which may limit follow-up.

Track your win rate

Once each RFQ has an outcome, you can see where you win. The basic formula:

Win rate = RFQs won / RFQs quoted (with a decision)

With sample numbers: you quoted 120 RFQs last quarter and 90 have a decision. You won 27. Win rate is 27 / 90 = 30%. By value, if the 90 decided quotes totaled $2.4 million and you won $540,000, your value win rate is 22.5%, which tells you that you win smaller jobs more often than large ones.

Break it down by:

CutWhat it shows
CustomerWho uses you as a real option and who uses you as a price check
Part type or processWhere you are competitive and where you are not
Bid/no-bid scoreWhether your scorecard predicts wins
Turnaround timeWhether fast quotes win more in your market
EstimatorWho needs help or a lighter load
Reason lost (price, lead time, spec, relationship)What to fix

Our win rate glossary entry covers the general definition. For where the RFQ sits in the full sale, from first contact to purchase order, see our guide to the manufacturing sales process.

If you want this run for you

Growigami puts AI agents on the work and our CMOs on the result. For a manufacturer, that can mean logging and acknowledging every RFQ, chasing missing information, and following up on every quote sent, while your estimators and engineers price the work. You pick a process (outbound, search, social, paid or your website); each starts at $1,999 a month, with a 3-month minimum and 30 days’ notice, and you approve everything before it goes out. See how it works for manufacturers and industrial suppliers.

Frequently asked

How do you respond to an RFQ?

Read the whole request, decide whether to bid, send clarifying questions before you price, build the quote in the buyer's format line by line, have someone else check it against the RFQ, submit before the deadline, confirm the buyer received it, and follow up until there is a decision. Record the outcome so you can see your win rate by customer and part type.

What should an RFQ response include?

At minimum: your company and contact details, the RFQ reference, a clear description of each item, quantities and units, unit and total prices, taxes, lead time or delivery dates, payment terms, the quote's expiry date, any assumptions, exclusions and deviations from the spec, and space for the buyer's acceptance. Add certificates and documents the RFQ asks for.

How do you reply to an RFQ email?

Reply the same day to confirm you received it, say when the quote will arrive, and list any questions you need answered to price it. For example: 'Thanks for RFQ 2231. We plan to send pricing by Thursday. To quote accurately, can you confirm the material grade on line 4 and the annual volume?'

Should you respond to every RFQ?

No. Score each request against fit, capacity, margin, chance of winning and the customer's value before you spend estimating time. Declining early and politely protects the relationship better than a rushed quote you cannot deliver on.

What is the difference between an RFQ and an RFP?

An RFQ (request for quotation) asks for prices on a defined requirement: specific parts, quantities and specs. An RFP (request for proposal) asks suppliers to propose a solution when the requirement is less settled. In construction, RFQ can also mean request for qualifications, which screens contractors on experience before pricing.

How do you follow up on an RFQ you sent?

Confirm receipt within a day or two, offer to walk the buyer through the quote, and ask for the decision date. After that, check in at the decision date, and ask for feedback whether you win or lose. Follow the buyer's contact rules if the RFQ is a formal procurement process.

Alexander Chua

Co-Founder, Growigami